2019年12月英語六級聽力原文:試卷二講座聽力3
2020年7月英語四六級考試即將進(jìn)行,各位小伙伴準(zhǔn)備好了么?大家在備考時(shí)一定要多做真題,這樣才能更好地把握題目難度和重點(diǎn)詞匯等等。今天小編為大家?guī)?019年12月英語六級聽力原文:試卷二聽力篇章3,希望對你有所幫助~
ecording three.
錄音三
Today I'm going to talk about Germany's dream airport in Berlin.
今天我要講的是德國柏林的“夢想機(jī)場”。
The airport looks exactly like every other major modern airport in Europe, except for one big problem.
這座機(jī)場看起來和歐洲其他大型的現(xiàn)代化機(jī)場并沒有什么不同,只有一點(diǎn),
More than seven years after it was originally supposed to open, it still stands empty.
那就是在原計(jì)劃的開放時(shí)間過去7年多之后它仍然空置著。
Germany is known for its efficiency and refined engineering, but when it comes to its new ghost airport, this reputation could not be further from the truth.
德國以其高效和精湛的工程而聞名,但當(dāng)談到它的新幽靈機(jī)場時(shí),這種名聲卻與事實(shí)相差甚遠(yuǎn)。
Plagued by long delays, perpetual mismanagement, and ever saw ring costs, the airport has become something of a joke among Germans
在長期的延誤、長期的管理不善、以及不斷增加的成本的折磨下,這座機(jī)場成為了德國人的笑柄,
and a source of frustration for local politicians, business leaders and residents alike.
當(dāng)?shù)氐恼汀⑸探珙I(lǐng)袖和居民也為此感到沮喪。
Planning for the new airport began in 1989.
新機(jī)場的規(guī)劃工作始于1989年。
At the time, it became clear that the newly reunified Berlin would need a modern airport with far greater capacity than its existing airports.
那時(shí),重新統(tǒng)一后的柏林很顯然需要一個(gè)比現(xiàn)有機(jī)場容量大得多的現(xiàn)代化機(jī)場。
The city broke ground on the new airport in 2006.
柏林于2006年開始破土動工建造這座新機(jī)場。
The first major sign of problems came in summer 2010, when the construction corporation pushed the opening from October 2011 to June 2012.
問題的第一個(gè)主要跡象出現(xiàn)于2010年的夏天,當(dāng)時(shí)建筑公司將開放時(shí)間從2011年10月推遲到2012年6月。
In 2012, the city planted opening ceremony.
2012年,柏林舉行了新機(jī)場的開幕儀式。
But less than a month before hand, inspectors found significant problems with the fire safety system and push the opening back again to 2013.
但僅僅不到一個(gè)月的時(shí)間,檢查人員便發(fā)現(xiàn)消防安全系統(tǒng)存在重大問題,于是開放時(shí)間被推遲到2013年。
It wasn't just the smoke system, many other major problems subsequently emerged.
不僅僅煙霧系統(tǒng)出現(xiàn)了問題,隨后許多其他的大問題也開始顯現(xiàn)。
More than 90 meters of cable were incorrectly installed. 4000 doors were wrongly numbered. Escalators were too short.
90多米的電纜安裝不當(dāng)、4000扇門編號錯(cuò)誤、自動扶梯太短、
And there was a shortage of check in desks. So why were so many problems discovered?
辦理登機(jī)手續(xù)的桌子太少。為什么會出現(xiàn)這么多的問題呢?
Didn't the airport corporation decide to give up on the project and start over? The reason is simple.
機(jī)場公司為什么沒有放棄這個(gè)項(xiàng)目然后重新開始呢?原因很簡單,
People are often hesitant to terminate a project when they've already invested time or resources into it, even if it might make logical sense to do so.
當(dāng)人們已經(jīng)在某個(gè)項(xiàng)目上投入了時(shí)間和資源時(shí),雖然終止項(xiàng)目在邏輯上是合理的,但是他們通常會猶豫。
The longer the delays continued, the more problems inspectors found.
拖的時(shí)間越長,檢查人員發(fā)現(xiàn)的問題就越多。
Leadership of the planning corporation has changed hands nearly as many times as the opening date has been pushed back.
而且規(guī)劃公司領(lǐng)導(dǎo)層人員的變動次數(shù)和開幕時(shí)間拖延的次數(shù)幾乎一樣多。
Initially, rather than appointing a general contractor to run the project, the corporation decided to manage it themselves.
最初公司并沒有指派承包商,而是決定自己來操作該項(xiàng)目。
Despite lack of experience with an undertaking of that scale.
盡管他們?nèi)狈Σ僮髟撘?guī)模項(xiàng)目的經(jīng)驗(yàn)。
To compound the delays, the unused airport is resulting in massive costs.
該未投入使用的機(jī)場造成的巨大的損失使得拖延雪上加霜。
Every month it remains unopened costs between nine and 10 million euros.
在機(jī)場未投入使用期間,每月?lián)p失的費(fèi)用在900萬到1000萬歐元之間。
Assuming all goes well, the airport should open in October 2020,
假設(shè)一切順利,機(jī)場將于2020年10月開放,
but the still empty airport stands as the biggest embarrassment to Germany's reputation for efficiency and a continuing drain on city and state resources.
但目前仍空無一人的機(jī)場是頂著“高效率”頭銜的德國的最大恥辱,也是對城市和國家資源的一種持續(xù)性消耗。
22. What does the speaker say about the dream airport in Berlin?
22. 關(guān)于柏林的夢想機(jī)場,敘述者說了什么?
23. Why was there a need for a new airport in Berlin?
23. 為什么需要在柏林建一個(gè)新機(jī)場?
24. Why did Berlin postpone the opening of its dream airport again and again?
24. 柏林為何一再推遲夢想機(jī)場的開放?
25. What happens while the airport remains unused?
25. 在機(jī)場未投入使用期間會發(fā)生什么?